Today, Saturday, which feels like about 3 months into this project, we did a bunch of stuff. First, moved six thousand pounds of OSB about 6 feet so we could lay out the floor for real. (This means borrowing the pallet jack from our nice neighbor again.) Extended the plastic, laid out the last couple sleepers, finished stapling the 4200 rubber pads (actually we have about 100 left over), shortened the edge rails by 1.5 inches, and nailed in place all the sleepers. Then we started putting OSB in place. Lots and lots of OSB. We named Chuck the Wizard of OSB (pronounced "ahzb"). I told you it feels like this has been going on for months. And the office and bathrooms are painted very nice colors!